The RABDe 500 can operate at up to 200 kph / 120 mph when under ETCS level 2 supervision (as in the new Gotthard basic tunnel), and 160 kph / 100 mph if the line is equipped with conventional signalling, negotiating curves about 10% faster than non tilting trains. |