WE 7012 is 291 power that will grab 7018 and 55 empty hoppers off the connection.
Meanwhile the remaining stone power in the siding will head to Brittain Yard.
Date:
4/14/2021
Location:
Akron, OH
Views:
98
Collection Of:
Fred Stuckmann
Author:
Fred Stuckmann
Picture Categories: Action
This picture is part of album:
Wheeling combines 711 & 291 at Summit St.
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=5532656