GCRY 29 missing its Boiler Jacketing          
GCRY 2-8-0 Consolidation 29 is seen in the Process of having its Sheet Metal Around the Boiler being removed as it goes for its 1.572 day inspection at the GCRY Shops, The Engine plans to be running again in 2023
Date: 6/27/2021 Location: Williams, AZ Views: 289 Collection Of:   Ryan Hahn
Locomotives: GCRY 29(2-8-0)    Author:  Ryan Hahn
GCRY 29 missing its Boiler Jacketing
Picture Categories: Roster This picture is part of album:  Grand Canyon Railway
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5573694