Both sides of the jubilee locos are showing different designs: one side historical scenes, other side presence scenes. A few milestones of Swiss railway history: 2004 The first 200 km/h highspeed line opened for Re 460 intercity trains; 2016 After a CHF 12 billion investment the Gotthard basic tunnel opened; 2019 1.8 million passengers and 30.3 million tkm freight are daily using the 5317 km long Swiss rail network; 2020 With opening of the Ceneri basic tunnel the new alp transit corridor was finalized. |