175 years of Swiss railways  Contributor's Pick!       
Both sides of the jubilee locos are showing different designs: one side historical scenes, other side presence scenes. A few milestones of Swiss railway history: 2004 The first 200 km/h highspeed line opened for Re 460 intercity trains; 2016 After a CHF 12 billion investment the Gotthard basic tunnel opened; 2019 1.8 million passengers and 30.3 million tkm freight are daily using the 5317 km long Swiss rail network; 2020 With opening of the Ceneri basic tunnel the new alp transit corridor was finalized.
Date: 3/9/2022 Location: Yverdon,  CH Country Flag Views: 133 Collection Of:   Peider SwissTrip
Locomotives: SBB 420(UNKNOWN)    Author:  Peider SwissTrip
175 years of Swiss railways
Picture Categories: This picture is part of album:  175 years of Swiss railways
Share
User Comments
Name Type Comments Date
Scott Crotwell General Nice profile shot! 3/10/2022 5:54:36 PM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5716361