Conductor Aligning the Switch  Contributor's Pick!       
MA 2 has cleared the Valley Interchange track. The conductor is aligning the switch so the train can back up and pull covered hoppers out. The old CNJ Station is visible and other railfans also present.
Date: 6/29/2022 Location: Bound Brook, NJ Views: 88 Collection Of:   Steve Coraggio
Rolling Stock: EQUX 621030 (Covered Hopper) HCBX 1333 (Covered Hopper) Author:  Steve Coraggio
Conductor Aligning the Switch
Picture Categories: Roster,RollingStock,Yard,Station,Track,Action This picture is part of album:  MA-2 Works Bound Brook Yard and Heads West
Share
User Comments
Name Type Comments Date
Tim Darnell General Very nice shot of conductor throwing the switch!! 8/20/2022 8:54:53 PM
Steve Coraggio General Thank you, Tim!!!!! I like catching the conductor working with this set!!! 8/21/2022 8:15:31 AM
Scott Crotwell General Awesome shot of the conductor at work! 8/21/2022 10:03:01 AM
Steve Coraggio General Thank you very much!! Most of my shots in this album are of the conductor working . 8/22/2022 7:57:31 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5821546