The engineer of MA-2 is seen waving to another CSAO worker (CSAO)= Conrail Shared Assets Organization . MA-2 is on Track 1 east and will approach the Valley Interchange track shortly . The three headed searchlight signal is for the Valley Interchange Track is seen displaying Aspect Three Red Lights Name STOP SIGNAL Indication Stop NORAC Rule 292 NORAC= Northeast Operating Rules Advsiory Committee. The two headed signal to the left is for track 1 westbound signal. 70-300mm zoom lens used. |
Date:
1/11/2023 |
Location:
Bound Brook, NJ |
Views:
72 |
Collection Of:
Steve Coraggio |
Locomotives: |
Author: Steve Coraggio
|
|
Picture Categories: Roster,Scenic,RollingStock,Bridge,Winter,Signal,Track,Action |
This picture is part of album: MA-2 Delivers Covered Hopper ELTX 7092 to Bound Brook Yard, Then Departs. |