Their Job is Done Here  Contributor's Pick!       
The conductor will uncouple ELTX 7092 from CSX 6160. Their Job is done here
Date: 1/11/2023 Location: Bound Brook, NJ Views: 68 Collection Of:   Steve Coraggio
Locomotives: CSX 6160(GP40-2)   Rolling Stock: ELTX 7092 (Covered Hopper) Author:  Steve Coraggio
Their  Job is Done Here
Picture Categories: Roster,RollingStock,Winter,Yard,Track,Action This picture is part of album:  MA-2 Delivers Covered Hopper ELTX 7092 to Bound Brook Yard, Then Departs.
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5989744