MA-2 Slowly Proceeding to the Lehigh Line  Contributor's Pick!       
A close up nose-cab to long hood shot of CSX 6160 on the Valley Interchange Track and proceeding to the Lehigh Line. Slowly proceeding to the Lehigh Line. Westbound Track 1 signal is seen behind CSX 6160
Date: 1/11/2023 Location: Bound Brook, NJ Views: 64 Collection Of:   Steve Coraggio
Locomotives: CSX 6160(GP40-2)    Author:  Steve Coraggio
MA-2 Slowly Proceeding to the Lehigh Line
Picture Categories: Roster,Winter,Yard,Track,Action This picture is part of album:  MA-2 Delivers Covered Hopper ELTX 7092 to Bound Brook Yard, Then Departs.
Share
User Comments
Name Type Comments Date

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5989750