Conductor Steve climbs down to line the switches into the Michels Pit ballast loading site         
Date: 6/17/2023 Location: Waterloo, WI Views: 60 Collection Of:   Andre Wehrle
Locomotives: CP 6025(SD40-2)    Author:  Andre Wehrle
Conductor Steve climbs down to line the switches into the Michels Pit ballast loading site
Picture Categories: This picture is part of album:  WSOR Waterloo Subdivision
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=6048528