Unfortunately the local had a GEVO today as there was a W943 scheduled to go south the day after. The unit dropped off its consist on the main, then ran down the siding to assist mechanical with an autorack that M209 had bad ordered the night before. The unit pulled up to the reservoir signals then reversed into the siding. The train still had work to do north of Deshler in Custar, but the unit would be wyed around the southwest and southeast wyes before it would continue north long hood forward. |