Distributed power of four GE's are cut into the westbound (>) train about 2/3 back. One of their purposes is to keep the slack in from these engines to the lead engines. Those cars following the distributed power (remote controlled) had their slack run out. |
Date:
3/10/2007 |
Location:
Ontario, OR Map  |
Views:
68 |
Collection Of:

Floyd Gordon |
|
Author: Floyd Gordon
|
 |
Picture Categories: |
This picture is part of album: Floyd A. Gordon 1 |