07042416 CP prepares to install a new switch next to the CP/SOO bridge replacement project over BNSF Northtown CTC 35th         
Date: 4/24/2007 Location: Minneapolis, MN Views: 234 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
07042416 CP prepares to install a new switch next to the CP/SOO bridge replacement project over BNSF Northtown CTC 35th
Picture Categories: Bridge,Track This picture is part of album:  Restored Album
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=726115