070612014 CP/SOO bridge replacement project over BNSF Northtown CTC 35th         
Shoofly movement underway. Left span is lifted by large crane while huge center span on right has been placed on rollers to be pulled 6-feet laterally by hydraulic cylinder
Date: 6/12/2007 Location: Minneapolis, MN Views: 150 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
070612014 CP/SOO bridge replacement project over BNSF Northtown CTC 35th
Picture Categories: Bridge This picture is part of album:  Restored Album
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=779094