Rails are being laid on the new north span. Also the 2nd panel switch delivered months ago is now being dragged into position to prepare for cutting over from the Shoofly span to the new span. |
Date:
8/15/2007 |
Location:
Minneapolis, MN |
Views:
178 |
Collection Of:
The Slidebroker image by John Hill |
|
Author: John Hill
|
|
Picture Categories: Bridge |
This picture is part of album: Restored Album |