070913006 CP/SOO bridge replacement project over BNSF Northtown CTC 35th         
Last pair of the old SOO span girders have been removed and await the torch. Prep work is under way to resume concrete work at east abutment
Date: 9/13/2007 Location: Minneapolis, MN Views: 84 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
070913006 CP/SOO bridge replacement project over BNSF Northtown CTC 35th
Picture Categories: Bridge This picture is part of album:  Restored Album
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=879132