070913011 CP/SOO bridge replacement project over BNSF Northtown CTC 35th         
With old SOO bridge now completely removed, concrete work resumes on west abutment using "Big White" crane to shuttle bucket
Date: 9/13/2007 Location: Minneapolis, MN Views: 92 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
070913011 CP/SOO bridge replacement project over BNSF Northtown CTC 35th
Picture Categories: Bridge This picture is part of album:  Restored Album
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=879134