|
Title: |
Zebras at work in Austria, Germany and Italy |
Description: |
RTC uses 10 Siemens E 189 multisystems locomotives. This kind of locomotive puts out 6400 kW of power when powered by alternating current (15 kV/16.7 Hz or 25 kV/50 Hz), 6000 kW of power when they are hooked up to a 3 kV DC supply and 4200 kW when they are connected to a 1.5 kV DC supply. |
Photo Date: |
5/28/2017 Upload Date: 6/1/2017 4:37:41 AM |
Location: |
Gries am Brenner, AT |
Author: |
Peider SwissTrip |
Categories: |
|
Locomotives: |
RTC 189(UNKNOWN) |
Views: |
137 Comments: 1 |
|
|
|
Title: |
Zebras at work in Austria, Germany and Italy |
Description: |
With the BR 189 locomotives Lokomotion and RTC can take the trains across the Brenner Pass and past Tarvis without changing locomotives at the border between Italy and Germany/Austrig, minimizing stopping time at the borders. |
Photo Date: |
5/28/2017 Upload Date: 6/1/2017 4:37:45 AM |
Location: |
Matrei, AT |
Author: |
Peider SwissTrip |
Categories: |
|
Locomotives: |
RTC 189(UNKNOWN) |
Views: |
160 Comments: 1 |
|
|
|