The power for trains PR-3 and PR-3X head into the Valley Falls Yard. The trains will leave the yare together, and split up in the Cranston Yard. PR-3, which will take PW 2215 (you can see the back end of that unit on the left side of the photo) and PW 2010 and switch the Seaview interchange in Davisville, while PW 3903 will work the Port of Providence on PR-3X. PW caboose 5001 looks on at the right. |