OPEN ACCESS SUCCES STORY: In the need of a heavy powered locomotive, Hector Rail bought two Siemens ES64F4, which were built for Swiss SBB. As they were delivered with many month of delay, the Swiss operator refused 6 of a ordered batch of 18 of those ES64F4. |