NJT 4206 has the honor of leading the first train into the new shop. The wire train now has all its inspection personnel aboard, moved over to Track 2 (the west end) and is about to enter the building. It is worth noting again the catenary circuits for both Track 1 and Track 2 are divided into sections: the circuits outside the S&I facility are controlled elsewhere (at some master desk, I presume). The main (inside) catenary and the two buffer catenaries (one at each end of the building through the train doors) are controlled by the operators in the S&I facility. The buffer catenaries are interlocked such that the each buffer can be energized only when its respective train doors are fully opened - and - the train doors cannot be closed once the buffer is energized. In this photo, you can spot the breaks in the catenaries on both tracks - the sections heading into the building are the buffers. |
Date:
1/8/2008 |
Location:
Morrisville, PA |
Views:
337 |
Collection Of:
Christopher Smith |
Locomotives: |
Author: Christopher Smith
|
|
Picture Categories: |
This picture is part of album: NJT Morrisville Service & Inspection (S&I) facility |