Dates:1/1/1871 - 6/5/2017
Album Info:Finally, after nearly 30 years of off and on work, the City of Birmingham has decided to construct an Intermodal Station which will include Amtrak, Greyhound and the City Buses. The first construction package has been advertised and the City Council voted on Oct 29, 2013 to award the contract. The news has quoted 6 weeks as the start time. Let's see when it actually happens! This album will document the past, the present and the construction of the future station.
  Page Controls   View:  Pics Per Page:
The Relay House
Title:  The Relay House
Description:  Originally a hotel, when the railroads built into Birmingham, it was used as a Station. It was located at what is now known as 19th St and Morris Ave. It lasted until 1889 when Birmingham Passenger Station was built one block north.
Photo Date:  1/1/1900  Upload Date: 9/10/2013 2:39:51 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  262   Comments: 0
Birmingham Passenger Station
Title:  Birmingham Passenger Station
Description:  Built in 1889 to replace the Relay House. It was THE station in Birmingham until 1906 when the Birmingham Terminal Station was built. Birmingham Passenger Station continued to be used by the L&N and possibly the AB&A/AB&C until replaced in the 1960s. Originally a ground level station, the tracks were elevated in the early 1930s. It was located on the corner of 20th St. and Morris Ave.
Photo Date:  1/1/1900  Upload Date: 9/10/2013 2:44:00 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  396   Comments: 0
Modern L&N Station
Title:  Modern L&N Station
Description:  Built to replace the Birmingham Passenger Station (and to free up land for a new high rise office building) this station was actually built on the same parcel of land that the Relay House was located. Although built late in the railroad passenger era, it contained segregated waiting rooms, restrooms and lunch counters.
Photo Date:  1/1/1960  Upload Date: 9/10/2013 2:47:19 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  413   Comments: 0
Amtrak Station
Title:  Amtrak Station
Description:  In 1974, Amtrak was kicked out of the L&N station by the railroad. They had plans to sell the station and land to a developer so Morris Toters could be built. It never happened and Amtrak has spent the next 40 years in the under track area which was behind the 1960s building sandwiched between that building and and Sugar trucking company. (I know this is a small picture, Ill post a larger one when I can find it)
Photo Date:  1/1/1990  Upload Date: 9/10/2013 3:14:18 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  315   Comments: 0
Station entrance
Title:  Station entrance
Description:  In 2007, the 1960s station and parking lot had been bought by the City of$Birmingham and the station building was demolished to make room for the new station. The Sugar transloading companyy moved out in 2011. Finally, the passenger station was once agaim only a passenger station,, although it seems to be only a hole in the wall.
Photo Date:  9/16/2009  Upload Date: 9/10/2013 4:24:39 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  262   Comments: 0
Birmingham Intermodal - Arohitects rendering
Title:  Birmingham Intermodal - Arohitects rendering
Description:  This is the Architects rendering of the new Intermodal Station. Thanks to Giattina Aycock.
Photo Date:  1/1/2013  Upload Date: 9/10/2013 4:15:46 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  232   Comments: 0
BirminghamÜIntermodal Station - Architects rendering
Title:  BirminghamÜIntermodal Station - Architects rendering
Description:  A second view of the new Intermodal Station. And, no (I asked) the roof will not slant like it shows in picture. Thanks to Giattina Aycock.*
Photo Date:  1/1/2013  Upload Date: 9/10/2013 4:20:00 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  309   Comments: 0
Finally!!! First Construction Contract
Title:  Finally!!! First Construction Contract
Description:  The City of Birmingham City Council, on Oct. 29, 2013, approved the first Contract to begin construction on the new Intermodal Station. It has taken almost 30 years, but looks like the time has arrived. Item 33.
Photo Date:  10/29/2013  Upload Date: 11/5/2013 5:39:15 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station
Locomotives: 
Views:  132   Comments: 0
Birmingham Intermodal Ground Breaking
Title:  Birmingham Intermodal Ground Breaking
Description:  Finally, after 4 months of no progress, The City of Birmingham has officially broken ground on the project. The ground breaking was held at the end of 17th St at Morris Ave. This area will be the home of the temporary city bus station during construction and the parking lot when the project is finished.
Photo Date:  9/10/2013  Upload Date: 3/7/2014 4:43:53 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station
Locomotives: 
Views:  171   Comments: 0
Birmingham Intermodal Ground Breaking
Title:  Birmingham Intermodal Ground Breaking
Description:  As a part of the ground breaking, there were, of courses, speaches. Here is the Birmingham Mayor making his.
Photo Date:  3/7/2014  Upload Date: 3/7/2014 5:25:20 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station
Locomotives: 
Views:  179   Comments: 0
Birmingham Intermodal Ground Breaking
Title:  Birmingham Intermodal Ground Breaking
Description:  Shovels ready for the Ground Breaking
Photo Date:  3/7/2014  Upload Date: 3/7/2014 5:30:55 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station
Locomotives: 
Views:  128   Comments: 0
Birmingham Intermodal Ground Breaking
Title:  Birmingham Intermodal Ground Breaking
Description:  And with the turn of a few shovels, the Project "Officially" starts. Projected to take about 24 months.
Photo Date:  3/7/2014  Upload Date: 3/7/2014 5:33:10 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station
Locomotives: 
Views:  167   Comments: 0
Birmingham Intermodal project
Title:  Birmingham Intermodal project
Description:  This has been erected at 17th St and Morris Ave. This shows the layout of the new, 3 block long facility.
Photo Date:  3/7/2014  Upload Date: 3/7/2014 5:35:36 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station
Locomotives: 
Views:  224   Comments: 0
Constuction Begins
Title:  Constuction Begins
Description:  Today, April 16, 2014, the first signs of construction at the Intermodal Site. This is between 16th St and 17th st and will be a parking lot and temporary site of the City Bus transfer station while construction is in progress.
Photo Date:  4/16/2014  Upload Date: 4/16/2014 2:47:41 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  160   Comments: 0
Construction Begins
Title:  Construction Begins
Description:  Today, April 16, 2014, the first signs of construction at the Intermodal Site. This is between 16th St and 17th st and will be a parking lot and temporary site of the City Bus transfer station while construction is in progress. Fencing goes up first.
Photo Date:  4/16/2014  Upload Date: 4/16/2014 2:48:46 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  141   Comments: 0
Construction Begins
Title:  Construction Begins
Description:  Today, April 16, 2014, the first signs of construction at the Intermodal Site. This is between 16th St and 17th st and will be a parking lot and temporary site of the City Bus transfer station while construction is in progress.
Photo Date:  4/16/2014  Upload Date: 4/16/2014 2:49:56 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  543   Comments: 0
Construction Begins
Title:  Construction Begins
Description:  Today, April 16, 2014, the first signs of construction at the Intermodal Site. This is between 16th St and 17th st and will be a parking lot and temporary site of the City Bus transfer station while construction is in progress. Construction Trailer of Taylor - Miree.
Photo Date:  4/16/2014  Upload Date: 4/16/2014 2:50:57 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Passenger,Action
Locomotives: 
Views:  164   Comments: 0
DOT Sec. Foxx at Intermodal Site
Title:  DOT Sec. Foxx at Intermodal Site
Description:  Construction started today and the Sec. DOT Foxx showed up to view the site, show off the Hydrogen Bus and talk about funding shortage in the Highway Trust Fund.
Photo Date:  4/16/2014  Upload Date: 4/16/2014 3:59:15 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  190   Comments: 0
Intermodal
Title:  Intermodal
Description:  It has been a couple of months since the actual start of the project and here is the progress so far. This is going to be a parking lot for all passengers. It is located between 16th and 17th Sts on Morris Ave. When finished, temporary trailers will be brought in to be used for Central Station (city buses) is torn down and a new building is built. Work on the Amtrak portion is to follow the work on this block.
Photo Date:  4/16/2014  Upload Date: 6/18/2014 11:39:30 AM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  211   Comments: 0
Site overview so far
Title:  Site overview so far
Description:  This shows the work so far on the parking lot. This is shown from about 15th St and shows the NS & CSX track on the right with the project work on the left. The green field area is still owned by the CSX.
Photo Date:  7/16/2014  Upload Date: 7/16/2014 5:12:37 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Yard,Station,Track
Locomotives: 
Views:  189   Comments: 0
Central Station from track level.
Title:  Central Station from track level.
Description:  This is a track level shot of Central Station showning the platforms and track in the Amtrak Station. Central Station is to be torn down soon to make way for a new Central Station building in the same location. It is more economical to tear down this building and rebuild than to modify it for current needs.
Photo Date:  7/16/2014  Upload Date: 7/16/2014 5:15:12 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Track
Locomotives: 
Views:  239   Comments: 0
Cobble Stone
Title:  Cobble Stone
Description:  While working on the new parking lot where the "Hole Yard" was located, the contractors are taking up the cobble stone which formed Morris Ave and the Team Track road in the yard. These are being palletized for future use.
Photo Date:  7/16/2014  Upload Date: 7/16/2014 5:17:53 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Yard,Station
Locomotives: 
Views:  173   Comments: 0
Work continues
Title:  Work continues
Description:  Paving work can be seen here and the temporary office trailers for the City Bus passengers.
Photo Date:  8/1/2014  Upload Date: 8/2/2014 1:32:13 AM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  179   Comments: 0
Work continues
Title:  Work continues
Description:  Work continues on Site C, where parking will be located when finished. However, the City Buses will use this lot and the temporary tralers while the current Central Station is torn down and a new building is built. As far as the Train station portion (site A), if all goes well, work is scheduled to start there on Monday, August 1. Stay tuned for updates on all this.
Photo Date:  8/1/2014  Upload Date: 8/2/2014 1:36:24 AM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  189   Comments: 0
Almost finished with temporary City Bus facility
Title:  Almost finished with temporary City Bus facility
Description:  For the next couple of years, this will be the City Bus transfer facility. Just a little more wiring, plumbing and paving and it will be moving day, but when the electricians are finished, the Amtrak part construction will start.
Photo Date:  4/16/2014  Upload Date: 8/12/2014 5:05:20 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  195   Comments: 0
Amtrak Station / Intermodal Station construction to begin shortly
Title:  Amtrak Station / Intermodal Station construction to begin shortly
Description:  Here is a "Base" photo of the site of the new Intermodal Station. Currently, construction is set to begin on August 18. First work will be relocating the utilities for Amtrak followed by a new "temporary" entrance off 19th St. You can see where it will be - look below and just left of the two smoke stacks and you will see a grey doorway. There will be a walkway out into 19th St with a ADA accessible ramp to the left
Photo Date:  4/16/2014  Upload Date: 8/12/2014 5:28:52 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  196   Comments: 0
Temporary bus station open  but OOPPS!
Title:  Temporary bus station open but OOPPS!
Description:  Well, finally MAX has moved to its new temporary tranfer station. But, oopps! someone for got to hook up the toilets to a sewer, thus the septic tank trucks... Luckily, it is hooked up and all is well...
Photo Date:  8/26/2014  Upload Date: 9/19/2014 5:25:07 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station
Locomotives: 
Views:  182   Comments: 0
Buses running and work continues
Title:  Buses running and work continues
Description: 
Photo Date:  8/26/2014  Upload Date: 9/19/2014 5:26:06 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station
Locomotives: 
Views:  188   Comments: 0
Deconstruction
Title:  Deconstruction
Description:  Start of the deconstruction of Central Station.
Photo Date:  9/15/2014  Upload Date: 9/19/2014 5:27:47 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station
Locomotives: 
Views:  203   Comments: 0
First sign of coming work on Amtrak Station
Title:  First sign of coming work on Amtrak Station
Description:  This is the very first sign of work on Block A, where Amtraks new station will be located. It says "New Amtrack(sic) Power"!
Photo Date:  8/26/2014  Upload Date: 9/19/2014 5:31:17 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  169   Comments: 0
NS southbound
Title:  NS southbound
Description:  While taking pictures of the work on the new Intermodal project, NS southbound passes approaching 14th St.
Photo Date:  9/16/2014  Upload Date: 9/19/2014 5:37:43 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Action
Locomotives:  NS 7639(ES40DC)
Views:  161   Comments: 0
Work Starts
Title:  Work Starts
Description:  Mark this day down, November, 24, 2014, work started on the new station. Old and unused equipment is being removed from a utility room to make way for a temporary entrance for Amtrak. Around Christmas or New Years the station entrance will be located to this area with a temporary ramp down onto 19th St. This will allow foundation construction to start for the new building.
Photo Date:  11/24/2014  Upload Date: 11/24/2014 5:44:21 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  RollingStock,Station,Passenger
Locomotives: 
Views:  346   Comments: 0
Intermodal Station Progress
Title:  Intermodal Station Progress
Description:  Progress is slow but continues. So far, relocating the existing utilities, finding hidden sewer lines and starting to build the new, temporary, entrance for Amtrak. As soon as the utility cutover is finished and the new entrance is finished, the real work will start with drilling new foundation.
Photo Date:  12/15/2014  Upload Date: 12/15/2014 3:40:10 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  211   Comments: 0
Temporary Entrance work
Title:  Temporary Entrance work
Description:  AS the New Year approaches, take a look at the work in progress on the temporary entrance to the Amtrak Station. The move to the temporary entrance is expected to take place in 3 weeks. This will remain until the new building is almost finished in 18-24 months.
Photo Date:  12/29/2014  Upload Date: 12/29/2014 5:18:56 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  159   Comments: 0
Progress Update
Title:  Progress Update
Description:  This shows the progress of the temporary entrance to the Amtrak Station. It is now scheduled to open on Monday, February 2. You can see how far the entrance will move - the current entrance, since 1974, can be seen in the right middle of the photo. It is beyond the orange construction fencing where the blue canopy is. When this happens, the entire block and Morris Ave will be closed and foundation drilling will begin along with some utility relocation.
Photo Date:  1/27/2015  Upload Date: 1/27/2015 2:43:13 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  161   Comments: 0
Opening Day - Temporary Entrance Open
Title:  Opening Day - Temporary Entrance Open
Description:  After several months of work, the Temporary Entrance is finally open today, February 9, 2015! It may not be the finest of train station entrances, It does move the project forward and give hope to the long awaited new Intermodal Station. Signage is minimal at this time - You can see the Amtrak Sign above the entrance which had just been moved from the parking lot.
Photo Date:  2/9/2015  Upload Date: 2/10/2015 11:27:04 AM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  173   Comments: 0
No more getting in this way - The "hole in the wall".
Title:  No more getting in this way - The "hole in the wall".
Description:  Immediately after opening the temporary entrance, work continued in the parking lot taking up the cement area around the former front door. Coming later this week is the equipment to drill the foundation of the new building.
Photo Date:  2/9/2015  Upload Date: 2/10/2015 11:29:47 AM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  206   Comments: 0
Slow progress - foundataion drilling
Title:  Slow progress - foundataion drilling
Description:  Russo Corporation is drilling the foundation for the new Station building. There are about 70 holes that are being drilled, with some over 50 ft deep. They are about 2/3 finished. The thing you can note in this view is that the 3 oak trees that were planted by the L&N in front of the 1960s station are now gone.
Photo Date:  4/7/2015  Upload Date: 4/9/2015 4:33:23 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  191   Comments: 0
Past uncovered
Title:  Past uncovered
Description:  On the front of the current Amtrak station, a piece of plywood was removed and the past was uncovered. There is the remnant of the clock that was behind the ticket counter of the 1960s L&N Station.
Photo Date:  7/15/2015  Upload Date: 7/15/2015 3:13:27 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  220   Comments: 0
Former entrance
Title:  Former entrance
Description:  The former entrance to the current Amtrak station looks even more forelorned. Now minus the Blue Amtrak canopy.
Photo Date:  7/15/2015  Upload Date: 7/15/2015 3:15:33 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  159   Comments: 0
Site of the Intermodal Station today
Title:  Site of the Intermodal Station today
Description:  The real construction is about to start. The land if finally being graded to allow the new construction company to start work.
Photo Date:  7/15/2015  Upload Date: 7/15/2015 3:17:28 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  178   Comments: 0
City bus building work starting
Title:  City bus building work starting
Description:  Meanwhile, in the middle block of the Intermodal facility, work is underway on the new "Central Station" for city bus transfers.
Photo Date:  7/15/2015  Upload Date: 7/15/2015 3:19:14 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  175   Comments: 0
Work continues
Title:  Work continues
Description:  An updated photo of the site of the new station. The new Contractor has taken over and is now digging dirt down to the foundation that has been poured. Concrete will follow shortly and the shape of the building will be visable.
Photo Date:  8/5/2015  Upload Date: 8/5/2015 1:08:55 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  203   Comments: 0
Fuel Tank???
Title:  Fuel Tank???
Description:  This tank showed up this morning and was unloaded from a simi truck. It will probably for fuel for Greyhound, not Amtrak. It is marked to be installed below ground under the bus parking area within the intermodal facility.
Photo Date:  8/5/2015  Upload Date: 8/31/2015 4:44:51 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  132   Comments: 0
Honey Bees
Title:  Honey Bees
Description:  As a part of building the new station, the construction company needed to remove the brick veneer that was placed by a Law firm in 1979, over the retaining wall on each side of the old station ticket office. When they put the brick up, it covered up the windows in womens lounges on each side. Over the years of sugar transloading ajacent to the station, Honey Bees started visiting. And, it seems they built a nest in the window void behind the brick. Well, Friday, the wall started coming down and here is the bee hive that was found. I dont know how many millions of bees there are in this picture. The hive and bees were removed by a bee keeper the next morning. And, no! we didnt get any of the honey!
Photo Date:  9/11/2015  Upload Date: 9/14/2015 4:19:23 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  258   Comments: 0
Construction continues
Title:  Construction continues
Description:  Finally, the building begins to come out of the ground. You can see two structures being built. In the foreground will be a stairwell. In the backgrouund will be stairwell and elevator. These are to access the upper floors of the building which will house the transit authority offices.
Photo Date:  10/9/2015  Upload Date: 10/14/2015 2:07:06 AM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  176   Comments: 0
Gone
Title:  Gone
Description:  The hole in the wall entrance to the Amtrak station since the mid 1970s is gone! Also gone is the old REA door and the old post office loading dock. All have been blocked up.
Photo Date:  10/9/2015  Upload Date: 10/14/2015 2:10:24 AM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  157   Comments: 0
Station view changing soon
Title:  Station view changing soon
Description:  The parking garage across the street from the station is on the National Register of Historic buildings, or so I have been told. It si the first of its type. Over the years it has aged poorly on the outside. While used continuously and currently the parking deck for Condos, the ouside has been allowed to deteriorate. Most people think it is a falling down abandoned building. Finally, something is going to be done. Here is a redition of what it will look like when you exit the new station!
Photo Date:  10/16/2015  Upload Date: 10/16/2015 5:25:08 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  202   Comments: 0
New building progress from 18th St.
Title:  New building progress from 18th St.
Description:  This is a view of the progress from teh 18th St. end of Morris Ave. The steel is going up! Im told they are actually about a month and a half ahead of schedule! On the corner will be the entrance to the Birmingham Jefferson County Transit Authoritys central office on the second floor. Also there will be a Police substation. Pictures from the other end (19th St) dont show much yet. By the first of the year, I should be able to get a picture that will show more of what to expect when finished.
Photo Date:  12/15/2015  Upload Date: 12/15/2015 5:14:44 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  149   Comments: 0
Updated view from 19th Street
Title:  Updated view from 19th Street
Description:  Compare this picture to the one from Dec. 29, 2014. You can see the progress made in the last year. Of course, there is a lot of work that has been done that cant be seen. The steelwork is almost complete.
Photo Date:  1/19/2016  Upload Date: 1/19/2016 3:56:35 PM
Location:  Birmingham, AL
Author:  Bob Hasty
Categories:  Station,Passenger
Locomotives: 
Views:  170   Comments: 0


Site Design ©2001-2020 Tim Huemmer
Photos © respective authors
  Contact: info@rrpicturearchives.net